Tags

, , , , , , , , , , , , , , , ,

Numbers four and five in the rotation are Lot 95 and Lot 97 respectively. Lot 95 will host the largest Promenade in this phase. Lot 97 (right behind us) will have a Palazzo. Framing began this week on Lot 95, and Lot 97 saw their stem wall built and filled with pea gravel — in preparation for their slab, which will be poured very soon.

This slideshow requires JavaScript.

Click on any picture below for a larger view.