This gallery contains 3 photos.
We sweated this out during framing. We weren’t sure, for a long while, if we could have this space under …
24 Thursday Nov 2011
05 Saturday Nov 2011
15 Saturday Oct 2011
15 Saturday Oct 2011
08 Saturday Oct 2011
08 Saturday Oct 2011
Tags
framing, Lot 95, lumber, neighbors, photos, Promenade, The Maples, The Rotation
This gallery contains 54 photos.
On Lot 95 is the large Promenade — number four in the rotation. Their framing is coming along nicely and you …
08 Saturday Oct 2011
Tags
concrete, foundation, framing, Lot 97, lumber, neighbors, Palazzo, photos, slab, The Maples, The Rotation
This gallery contains 11 photos.
Next door to us, the Palazzo on Lot 97 went vertical this week. See this exciting progress from the slab …
02 Sunday Oct 2011
02 Sunday Oct 2011
Tags
Carol, concrete, Ed, floorplan, framing, house, Lot 98, lumber, master bath, photos, plumbing, Promenade, rooms, shower, The Maples, tile, windows
This gallery contains 15 photos.
As with prepping the kitchen (my previous post), there are similar preparations needed for the master bath. Our adjustments from …
02 Sunday Oct 2011